What is Setting Up a Tank Farm Storage of A, B, C Class Products?
Setting Up a Tank Farm Storage of A, B, C Class Products is a lapsed water and irrigation project in Sheva, Uran, Raigarh, Maharashtra. The site covers 5.4 acres.
Who is building it?
The applicant is Suraj Agro Infrastructure PVT LTD.
Has it been approved?
No. The application was lapsed on 9 Dec 2024, so it is no longer under consideration.
Where is it?
In Sheva, Uran, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹4 crore and a site of 5.4 acres.
When was it filed?
The application was filed on 27 Apr 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Dec 2024 |
| Application filed | 27 Apr 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Suraj Agro Infrastructure PVT LTD |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹4 crore |
| Village / locality | Sheva |
| Taluk / tehsil | Uran |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17828 |
In context
31 applications in Raigarh since January 2022 are in the same category (Water & irrigation): 11 approved, 14 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.4 acres, this one is smaller than 93% of them.
44 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sheva, Uran, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Jetty Pipelines Connectivity portion between Plot No. 4 and Plot No.… — lapsed, 1 km away
- EDC Dockline from JNPT Berth to Tank Farm — coastal clearance granted, 1.4 km away
- Balance work of 4th Container Terminal & Marine Container Terminal at JNPT by… — environmental approval granted, 1.7 km away
- Balance work of 4th Container Terminal & Marine Container Terminal at JNPT by… — lapsed, 1.7 km away
- Proposed Liquid & Gas Storage Terminal at Plot No. EN-211, Sector 2, Eastern… — recommended by coastal authority, 1.7 km away
- Proposed Jetty Pipelines Connectivity portion between Shallow Water Berth… — lapsed, 1.7 km away
- Proposed "Agricultural Processing and Storage Facility" Project by M/s Trident… — environmental approval granted, 2.3 km away
- Amendment in Environmental Clearance of Coastal Berth for Development of… — under environmental review, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.