Quick answers
What is this project?
Sewage Treatment Plant No - 9 On Poisar River for Rejuvenation and Beautification is an approved waste management project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 0.5 acres.
Who is building it?
The applicant is Municipal Corporation of Greater Mumbai.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 11 Sept 2024), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹49.2 crore and a site of 0.5 acres.
When was it filed?
The application was filed on 1 Feb 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sewage Treatment Plant No - 9 On Poisar River for Rejuvenation and Beautification
Project details
| Official title | Construction of Sewage Treatment Plant No - 9 On Poisar River for Rejuvenation and Beautification |
|---|---|
| Status | Coastal clearance granted |
| Status since | 11 Sept 2024 |
| Application filed | 1 Feb 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Waste management |
| Applicant | Municipal Corporation of Greater Mumbai |
| Land area | 2,200 m² |
| Project cost | ₹49.2 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17948 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Jul 2024 | Forest land use approved | 0.5 acres | ₹49.2 crore |
| New project filed 1 Feb 2024 (this page) | Coastal clearance granted | 0.5 acres | ₹49.2 crore |
In context
7 applications in Mumbai Suburban since January 2022 are in the same category (Waste management): 5 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval.
559 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (13.4 km away).
Other projects nearby
- Sewage Treatment Plant No - 9 On Poisar River for Rejuvenation and… — forest land use approved, 0 m away
- CRZ Clearance for Proposed Redevelopment of Residential Building "Mayura Co.op… — recommended by coastal authority, 200 m away
- Proposed Residential cum Commercial Project under SRA Scheme at S.NO. 157(pt),… — cleared for impact study, 300 m away
- Environment clearance for proposed redevelopment of building on plot bearing… — environmental approval granted, 300 m away
- Application for Amendment & Expansion in EC (along with Consent to Establish… — lapsed, 500 m away
- Application for Amendment & Expansion in EC for the Redevelopment of existing… — more information requested, 500 m away
- Application for EC for the Redevelopment of existing Residential Bldgs. at… — environmental approval granted, 500 m away
- Request for Rectification/Modification of Coastal Zone Management Plan (CZMP)… — more information requested, 500 m away
More from Municipal Corporation of Greater Mumbai in Mumbai Suburban
- Proposed Twin Tunnel for Conveyance of Treated Wastewater from Dharavi WWTF to… — recommended by coastal authority
- Demolition and reconstruction of bridge on Nalah for connectivity of Upper and… — coastal clearance granted
- Permission Geotechnical Investigation within Sanjay Gandhi National Park for… — lapsed
- Amendment of Environmental Clearance: for 600 TPD Waste to Energy Project from… — environmental approval granted
- Reconstruction of dilapidated Culvert/Bridge in R/Central ward culverts on… — coastal clearance granted
- 600 Tpd Waste to Energy Project to Generate About 4 MW of Power at Deonar,… — withdrawn
All 13 Municipal Corporation of Greater Mumbai projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.