Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 29 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Digital Edge Dc Two (India) Private Limited |
| Use | IT / offices |
| Land area | 30.1 acres (12.2 ha) |
| Built-up area | 2,15,939 m² (23,24,346 sq ft) |
| Project cost | ₹12,861 crore |
| Village / locality | Asode |
| Taluk / tehsil | Ambarnath |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17966 |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 30.1 acres, this one is larger than 88% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asode, Ambarnath, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Data Centre project at Plot Sr. No. 2/1, 9/1A, 9/1B, 9/2/1, 10/1,… — environmental approval granted, 500 m away
- Expansion in Data Centre project at Plot Sr. No. 2/1, 9/1A, 9/1B, 9/2/1, 10/1,… — under environmental review, 500 m away
- Expansion in Data Centre project at Plot Sr. No. 2/1, 9/1A, 9/1B, 9/2/1, 10/1,… — cleared for impact study, 500 m away
- Proposed Data Centre project at Plot Sr. No. 2/1, 9/1B, 21, 22/A, 22/B, 22/C,… — environmental approval granted, 600 m away
- Proposed Data Centre project at Plot Sr. No. 2/1, 9/1B, 21, 22/A, 22/B, 22/C,… — cleared for impact study, 600 m away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — environmental approval granted, 1 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 1 km away
- Proposed Data Centre Campus "BOM 105" in Plot DC-01 by M/s. AMAZON DATA… — cleared for impact study, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.