Proposed Redevelopment of existing building no. 240 & 242, on plot bearing S. No. 113 (pt), CTS No. 356/A/2/1 by Atom Reaalty Ventures LLPP

Proposed Redevelopment of existing building no. 240 & 242, on plot bearing S. No. 113 (pt), CTS No. 356/A/2/1 by Atom Reaalty Ventures LLPP is a proposed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 0.5 acres. Its stated project cost is ₹175.4 crore. As of 27 Nov 2026, its status is “Initial checks” (since 6 Nov 2026).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Redevelopment of existing building no. 240 & 242, on plot bearing S. No. 113 (pt), CTS No. 356/A/2/1 by Atom Reaalty Ventures LLPP is a proposed building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 0.5 acres.

Who is building it?

The applicant is Atom Reaalty Ventures Llpp.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹175.4 crore and a site of 0.5 acres.

When was it filed?

The application was filed on 2 Nov 2026.

Project details

Official titleProposed Redevelopment of existing building no. 240 & 242, on plot bearing S. No. 113 (pt), CTS No. 356/A/2/1 at Village: Hariyali, Kannamwar Nagar, Vikhroli, (East), Taluka & District: Mumbai – 400083, Maharashtra, India by Atom Reaalty Ventures LLPP
StatusInitial checks
Status since6 Nov 2026
Application filed2 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAtom Reaalty Ventures Llpp
Land area2,000 m²
Project cost₹175.4 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-18050

What the filings say

What is planned

Atom Reaalty Ventures LLPP proposes the redevelopment of existing buildings No. 240 and 242 at Kannamwar Nagar, Vikhroli (East). The project is situated on a plot of 0.2 hectares (0.49 acres) with a total project cost estimated at ₹175.35 crore.

The redevelopment involves the construction of a residential and commercial complex. According to the layout plans, the project includes four wings (Wing A, B, C, and D). The ground floor is designed to accommodate multiple commercial shops, residential entrance lobbies for each wing, and essential services including a sub-station, fire control room, and security cabin.

Layout and design

The ground floor plan shows a series of commercial shops (numbered 1 to 30 across different sections) facing the existing 17.10-metre wide layout road. The building footprint includes dedicated residential entrances for each of the four wings. Vertical circulation is provided through multiple lifts, including specialized fire evacuation lifts and car lifts.

A 1.65-metre wide passage and a driveway are planned within the site. The layout incorporates specific areas for a Sewage Treatment Plant (STP) and Organic Waste Converter (OWC). The building line extends above the ground floor commercial spaces, with chajjas (projections) of 0.40 to 0.50 metres planned for weather protection.

Water, power and access

The project will draw its water supply from the Brihanmumbai Municipal Corporation (BMC). During the operation phase, the total sewage generation is estimated at 106 kilolitres per day (KLD). To manage this, the applicant proposes an on-site STP with a capacity of 120 KLD. Treated water will be reused for flushing (32 KLD) and gardening (1 KLD), with the excess discharged into the municipal sewer line.

For rainwater management, a harvesting tank with a capacity of 50 kilolitres (KL) is planned. Power will be sourced from the local grid, supplemented by Diesel Generator (DG) sets for emergency backup. Energy-saving measures include LED lighting, solar panels, and energy-efficient lifts with Variable Voltage Variable Frequency (VVVF) drives.

Access to the site is provided via an existing 17.10-metre wide layout road and an existing 12.20-metre wide layout road. The plan includes separate entry and exit gates to regulate traffic flow.

Environmental safeguards

The applicant's Environmental Management Plan (EMP) outlines several mitigation measures for the construction and operation phases:

Timeline

The construction phase is expected to last approximately five years. The excavation period alone is estimated to take five to six months.

Atom Reaalty Ventures LLPP Redevelopment of Existing Building No. 240 & 242, site plan and layout

A drawing from the project's filings. Sign in free to see it.

Atom Reaalty Ventures LLPP Redevelopment of Existing Building No. 240 & 242,: Ground floor plan: Wing A, B, C and D showing shops, lobbies and car lifts (preview)🔒 Sign in free to see it
Ground floor plan: Wing A, B, C and D showing shops, lobbies and car lifts

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.5 acres, this one is smaller than 91% of them.

247 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (3.3 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.