Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Jul 2024 |
| Application filed | 8 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Heileen Diengdoh |
| Land area | 12.2 acres (5 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Phodkroh |
| Taluk / tehsil | Ranikor |
| District | South West Khasi Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00068 |
In context
15 applications in South West Khasi Hills since January 2022 are in the same category (Mining): 7 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 12.2 acres, this one is larger than 53% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Phodkroh, Ranikor, South West Khasi Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Phudkroh Limestone Mine — environmental approval granted, 2.2 km away
- Bagli Limestone Quarry — returned to applicant, 6 km away
- Anderson Limestone Mine — environmental approval granted, 14.1 km away
- Kalagaw Coal Mine — cleared for impact study, 14.9 km away
- Kalagaw Coal Mine — withdrawn, 14.9 km away
- Kalagaw Coal Mine — cleared for impact study, 14.9 km away
- Nongkulang Limestone Mine — environmental approval granted, 16.3 km away
- Sylva Limestone Mine — environmental approval granted, 18.2 km away
More from Heileen Diengdoh in South West Khasi Hills
- Phudkroh Limestone Mine — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.