Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Nov 2025 |
| Application filed | 2 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Renikton Lyngdoh Tongkhar |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Bagli |
| Taluk / tehsil | Ranikor |
| District | South West Khasi Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00145 |
In context
15 applications in South West Khasi Hills since January 2022 are in the same category (Mining): 7 approved, 3 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.9 acres, this one is smaller than 73% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Bagli, Ranikor, South West Khasi Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Marak Pavers Limestone Mine — under environmental review, 1 km away
- Bagli Limestone Mine (4.99 ha) — lapsed, 1 km away
- Bagli Lime Stone Quarry — lapsed, 1 km away
- Limestone Mine — under environmental review, 1.1 km away
- Bagli Limestone Mine — lapsed, 1.2 km away
- Sylva Limestone Mine — environmental approval granted, 1.8 km away
- Kalagaw Coal Mine — cleared for impact study, 4.6 km away
- Kalagaw Coal Mine — withdrawn, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.