Quick answers
What is Mining project by M/S Kolpo Brick Industry?
This approved mining project by M/S Kolpo Brick Industry is in Damalgre, Betasing, South West Garo Hills, Meghalaya. The site covers 4.9 acres.
Who is building it?
The applicant is Ms Kolpo Bricks.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Oct 2026), as of 27 Nov 2026.
Where is it?
In Damalgre, Betasing, South West Garo Hills, Meghalaya.
How big is it?
It has a stated cost of ₹8 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 5 May 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Oct 2026 |
| Application filed | 5 May 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Ms Kolpo Bricks |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Damalgre |
| Taluk / tehsil | Betasing |
| District | South West Garo Hills |
| State | Meghalaya |
| Location from | Site boundary on record |
| Our reference | WID-ML-00247 |
In context
12 applications in South West Garo Hills since January 2022 are in the same category (Mining): 9 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is larger than 75% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Damalgre, Betasing, South West Garo Hills, Meghalaya. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bolgangre Brick Earth Mine — under environmental review, 4.6 km away
- Rds Bricks — environmental approval granted, 4.7 km away
- Mining project by M/S Rna Bricks — environmental approval granted, 8.7 km away
- Ms Kds Bricks Industry — environmental approval granted, 9.1 km away
- Maljanggre River Bed Sand Mine — environmental approval granted, 12.2 km away
- Manggapara Stone Mine — environmental approval granted, 12.3 km away
- Manggapara Stone Mine — more information requested, 12.8 km away
- Manggapara Stone Mine — returned to applicant, 12.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.