Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Apr 2026 |
| Application filed | 21 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Phed |
| Land area | 5 acres (2 ha) |
| Forest land | 5 acres (2 ha) |
| Project cost | ₹14.5 crore |
| Village / locality | Gadailong |
| Taluk / tehsil | Tamenglong |
| District | Tamenglong |
| State | Manipur |
| Location from | Site boundary on record |
| Our reference | WID-MN-00008 |
Where it is
Gadailong, Tamenglong, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- USOF funded 4G Saturation Project in Manipur — in-principle approval, conditions pending, 7.1 km away
- USOF funded 4G Saturation Project in Manipur — lapsed, 7.1 km away
- USOF 4G Saturation Project for Manipur — forest land use approved, 11.5 km away
- USOF 4G Saturation Project for Manipur — decision issued, 11.5 km away
- Two lane with Paved Shoulder of Old Tamenglong- Phelong Section(Package-3,… — more information requested, 13.4 km away
- Two lane with Paved Shoulder of Old Tamenglong- Phelong Section (Package-3,… — more information requested, 13.4 km away
- Two lane with Paved Shoulderof Phelong-Azuram Section (Package-4, From… — more information requested, 13.8 km away
- Two lane with Paved Shoulder of Azuram- Mandeu Section (Package-5, From Km… — more information requested, 15.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.