One of 2 filings for this project. The project's main page, with every filing and where each stands: Augmentation of Water Treatment Plant at Keibul Lamjao
Project details
| Status | Under forest review |
|---|---|
| Status since | 22 Nov 2026 |
| Application filed | 31 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Phed |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1.2 acres (0.5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Keibul |
| Taluk / tehsil | Moirang |
| District | Bishnupur |
| State | Manipur |
| Location from | Site area on record |
| Our reference | WID-MN-00012 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Aug 2024 (this page) | Under forest review | 1.2 acres | ₹1.5 crore |
| New project filed 12 Mar 2024 | Decision issued | 1.2 acres | ₹1.5 crore |
In context
12 applications in Bishnupur since January 2022 are in the same category (Water & irrigation): 3 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. At 1.2 acres, this one is larger than 92% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Keibul, Moirang, Bishnupur, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Augmentation of Water Treatment Plant at Keibul Lamjao (0.40 MLD) — lapsed, 100 m away
- Augmentation of Water Treatment Plant at Keibul Lamjao (0.40 MLD) — application filed, 100 m away
- Augmentation of Water Treatment Plant at Keibul Lamjao — decision issued, 100 m away
- "Development of Loktak Lake Experience" in Loktak, Manipur — lapsed, 2.2 km away
- "Development of Loktak Lake Experience" in Loktak, Manipur — more information requested, 2.2 km away
- Augmentation of Water Treatment Plant at Thanga — more information requested, 5 km away
- Augmentation of Water Treatment Plant at Thanga (0.80 MLD) — application filed, 5 km away
- Augmentation of Water Treatment Plant at Thanga (0.80 MLD) — lapsed, 5 km away
More from Phed in Bishnupur
- Augmentation of Water Treatment Plant at Thanga — more information requested
- Construction of Water Treatment Plant at Naodangkhong — more information requested
- Augmentation of Water Treatment Plant at Wathalambi — more information requested
- Construction of Water Treatment Plant at Tampha Khunou — more information requested
- Augmentation of Water Treatment Plant at Keibul Lamjao (0.40 MLD) — lapsed
- Construction of Water Treatment Plant at Naodangkhong — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.