What is Developing? Open the mapMap

LapsedRailways & metro · Noney, Manipur

Additional Land Acquisition at Proposed Tupul Railway Station Area

Additional Land Acquisition at Proposed Tupul Railway Station Area is a lapsed railway project in Maranging, Tamenglong, Noney, Manipur. The site covers 180.9 acres. As of 27 Nov 2026, its status is “Lapsed” (since 1 Aug 2025).

See it on the live map All projects in Noney

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Additional Land Acquisition at Proposed Tupul Railway Station Area is a lapsed railway project in Maranging, Tamenglong, Noney, Manipur. The site covers 180.9 acres.

Who is building it?

The applicant is Ministry of Railway.

Has it been approved?

No. The application was lapsed on 1 Aug 2025, so it is no longer under consideration.

Where is it?

In Maranging, Tamenglong, Noney, Manipur.

How big is it?

It has a site of 180.9 acres and 180.9 acres (73.2 ha) of forest land.

When was it filed?

The application was filed on 22 Jun 2025.

Project details

StatusLapsed
Status since1 Aug 2025
Application filed22 Jun 2025
Approval soughtForest land use
Application typeNew project
SectorRailways & metro
ApplicantMinistry of Railway
Land area180.9 acres (73.2 ha)
Forest land180.9 acres (73.2 ha)
Village / localityMaranging
Taluk / tehsilTamenglong
DistrictNoney
StateManipur
Location fromSite boundary on record
Our referenceWID-MN-00078

Where it is

Maranging, Tamenglong, Noney, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

All 149 Ministry of Railway projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.