Quick answers
What is this project?
Laying of Proposed Dimapur - Imphal Pipeline of 12" Dia Carbon steel is a lapsed pipeline project in Hengbung, Kangpokpi, Manipur. The site covers 8.2 acres.
Who is building it?
The applicant is Indradhanush Gas Grid Limited.
Has it been approved?
No. The application was lapsed on 13 Jan 2025, so it is no longer under consideration.
Where is it?
In Hengbung, Kangpokpi, Manipur.
How big is it?
It has a stated cost of ₹926.5 crore; a site of 8.2 acres and 8.2 acres (3.3 ha) of forest land.
When was it filed?
The application was filed on 12 Jun 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Laying of Proposed Dimapur - Imphal Pipeline of 12" Dia Carbon steel
Project details
| Official title | Laying of Proposed Dimapur - Imphal Pipeline of 12" Dia Carbon steel Along with OFC Conduit in the Kangpokpi District, Manipur |
|---|---|
| Status | Lapsed |
| Status since | 13 Jan 2025 |
| Application filed | 12 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indradhanush Gas Grid Limited |
| Land area | 8.2 acres (3.3 ha) |
| Forest land | 8.2 acres (3.3 ha) |
| Project cost | ₹926.5 crore |
| Village / locality | Hengbung |
| Taluk / tehsil | Kangpokpi |
| District | Kangpokpi |
| State | Manipur |
| Location from | Site boundary on record |
| Our reference | WID-MN-00084 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 3 Feb 2025 | Forest land use approved | 1.8 acres | ₹926.5 crore |
| New project filed 12 Jun 2024 (this page) | Lapsed | 8.2 acres | ₹926.5 crore |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hengbung, Kangpokpi, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Proposed Dimapur - Imphal Pipeline of 12" Dia Carbon steel — forest land use approved, 4.1 km away
- Forest Clearance for Mining Plan for the Formation Filling Work From Ch.… — initial checks, 4.3 km away
- Forest Clearance for Mining Plan for the Railway Embankment Filling Work From… — initial checks, 10.2 km away
- Diversion work of 132 KV Dimapur Imphal line for Loc No. 162 — under forest review, 11 km away
- Diversion of Forest Land Measuring 0.20 Ha for Construction of Sv-09 Station — forest land use approved, 12.6 km away
- Diversion of 0.95 Ha of Forest Lands for Development of Multiple Rain Water… — lapsed, 19 km away
- Forest Clearance for Mining Plan for the Embankment Work in Imphal Valley for… — forest land use approved, 35.3 km away
- Forest Clearance for Mining Plan for the Embankment Work in Imphal Valley for… — lapsed, 35.3 km away
More from Indradhanush Gas Grid Limited in Kangpokpi
- Diversion of Forest Land Measuring 0.20 Ha for Construction of Sv-09 Station — forest land use approved
3 Indradhanush Gas Grid projects in Kangpokpi
All 39 Indradhanush Gas Grid projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.