What is Developing? Open the mapMap

More information requestedRoads & highways · Ukhrul, Manipur

Two laning with Hard shoulder of Ukhrul-Toloi-Tadubi Road Pkg-1 (Ukhrul Bypass) on NH-102A from De. Ch. 0.000 Km (Ex. Ch. 537.850 of NH-202) to De. Ch. 6.571 Km (Km. 9.840 of existing Ukhrul-Toloi-Tadubi Road) (Design Length-6.571 Km) in the State of Manipur by NHIDCL on EPC mode

Two laning with Hard shoulder of Ukhrul-Toloi-Tadubi Road Pkg-1 (Ukhrul Bypass) on NH-102A from De. Ch. 0.000 Km (Ex. Ch. 537.850 of NH-202) to De. Ch. 6.571 Km (Km. 9.840 of existing Ukhrul-Toloi-Tadubi Road) (Design Length-6.571 Km) in the State of Manipur by NHIDCL on EPC mode is a proposed road project in Hundung, Ukhrul, Manipur. The site covers 66.6 acres. Its stated project cost is ₹204.3 crore. As of 27 Nov 2026, its status is “More information requested” (since 9 Jul 2024).

See it on the live map All projects in Ukhrul

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Two laning with Hard shoulder of Ukhrul-Toloi-Tadubi Road Pkg-1 (Ukhrul Bypass) on NH-102A from De. Ch. 0.000 Km (Ex. Ch. 537.850 of NH-202) to De. Ch. 6.571 Km (Km. 9.840 of existing Ukhrul-Toloi-Tadubi Road) (Design Length-6.571 Km) in the State of Manipur by NHIDCL on EPC mode is a proposed road project in Hundung, Ukhrul, Manipur. The site covers 66.6 acres.

Who is building it?

The applicant is Nhidcl Bo Imphal.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Hundung, Ukhrul, Manipur.

How big is it?

It has a stated cost of ₹204.3 crore and a site of 66.6 acres.

When was it filed?

The application was filed on 9 Jul 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Two laning with Hard shoulder of Ukhrul-Toloi-Tadubi Road Pkg-1 (Ukhrul Bypass) on…

Project details

Official titleConstruction of Two laning with Hard shoulder of Ukhrul-Toloi-Tadubi Road Pkg-1 (Ukhrul Bypass) on NH-102A from De. Ch. 0.000 Km (Ex. Ch. 537.850 of NH-202) to De. Ch. 6.571 Km (Km. 9.840 of existing Ukhrul-Toloi-Tadubi Road) (Design Length-6.571 Km) in the State of Manipur by NHIDCL on EPC mode
StatusMore information requested
Status since9 Jul 2024
Application filed9 Jul 2024
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantNhidcl Bo Imphal
Land area66.6 acres (27 ha)
Project cost₹204.3 crore
Village / localityHundung
Taluk / tehsilUkhrul
DistrictUkhrul
StateManipur
Location fromSite boundary on record
Our referenceWID-MN-00151

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 9 Jul 2024 (this page)More information requested66.6 acres₹204.3 crore
New project filed 17 Oct 2023Forest land use approved66.6 acres₹204.3 crore

In context

11 applications in Ukhrul since January 2022 are in the same category (Roads & highways): 3 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected. At 66.6 acres, this one is smaller than 64% of them.

Where it is

Hundung, Ukhrul, Manipur. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nhidcl Bo Imphal in Ukhrul

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.