Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Nov 2022 |
| Application filed | 22 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Piyush Patidar |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Segaon |
| Taluk / tehsil | Segaon |
| District | West Nimar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00057 |
In context
175 applications in West Nimar since January 2022 are in the same category (Mining): 106 approved, 19 filed or under review, and 50 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Segaon, West Nimar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amended Bharat Net /BSNL Linear UG OFC laying project in Segaon Block DFO… — more information requested, 5.8 km away
- Gawala Stone Quarry — lapsed, 14.3 km away
- Widening of Existing 2 Lane to 4 Lane Divided Carriageway With Paved Shoulder… — forest land use approved, 14.9 km away
- Gandhawad Stone Quarry — environmental approval granted, 15.3 km away
- Ropeway project at Bhilat Dev Temple, Village-Piparkheda, Tehsil- Sendhwa,… — forest land use approved, 15.5 km away
- Rajur Stone Quarry Project — environmental approval granted, 17.7 km away
- Surpala Stone Mine — lapsed, 21 km away
- Temla Crusher Stone Quarry — environmental approval granted, 21 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.