Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Nov 2022 |
| Application filed | 16 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Vaishnvi Enviro Care Waste Management System |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹1.6 crore |
| District | Other |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00058 |
Where it is
Other, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Alipura-2 Sand Quarry on Dhasan River — under environmental review, 42.3 km away
- Alipura-2 Sand Quarry on Dhasan River — cleared for impact study, 42.3 km away
- Rampurghosi Stone Quarry — environmental approval granted, 99.4 km away
- Uttampur Laterite & Clay Deposit Quarry — cleared for impact study, 148.9 km away
- Grain Base fuel ethanol unit of 200 KLPD, 6.0 MW Co- generation power plant By… — environmental approval granted, 165.3 km away
- Karanpura-I Mvrwss Dist.Umaria and Katni — lapsed, 188.3 km away
- Bansagar Multi Village Rural Water Supply Scheme — lapsed, 197 km away
- Construction of WBM Road — lapsed, 278 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.