Quick answers
What is Stone Mining Project?
Stone Mining Project is a proposed mining project in Dhanwara, Khirkiya, Harda, Madhya Pradesh. The site covers 9.3 acres.
Who is building it?
The applicant is Ramshankar Patel.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 5 Apr 2023), as of 27 Nov 2026.
Where is it?
In Dhanwara, Khirkiya, Harda, Madhya Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 9.3 acres.
When was it filed?
The application was filed on 5 Apr 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 Apr 2023 |
| Application filed | 5 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ramshankar Patel |
| Land area | 9.3 acres (3.8 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Dhanwara |
| Taluk / tehsil | Khirkiya |
| District | Harda |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00536 |
In context
37 applications in Harda since January 2022 are in the same category (Mining): 15 approved, 8 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 30 days from filing to approval. At 9.3 acres, this one is smaller than 92% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Dhanwara, Khirkiya, Harda, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kharad Stone Quarry — lapsed, 1.1 km away
- Kharad Stone Quarry — cleared for impact study, 1.3 km away
- Sontalai Pachatalai Babar Neemkheda — forest land use approved, 7.8 km away
- Shaheed Ilap Singh Lift Micro Irrigation Project — cleared for impact study, 12.6 km away
- Kayagaon Murrum Quarry — environmental approval granted, 17.3 km away
- Kayagaon Murrum Quarry — lapsed, 17.4 km away
- Construction of Salyakhedi - Kakarda to Bhanswada Road — lapsed, 17.6 km away
- Construction of Uwan to Pantalai road — forest land use approved, 18.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.