One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion in Existing Formulation Plant, M/s Macleods Pharmaceuticals Limited
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 May 2023 |
| Application filed | 5 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Macleods Pharmaceuticals Limited |
| Land area | 28.2 acres (11.4 ha) |
| Project cost | ₹236 crore |
| Village / locality | Sindhipura |
| Taluk / tehsil | Depalpur |
| District | Indore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00557 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 Sept 2023 | Environmental approval granted | 28.2 acres | ₹236 crore |
| Early planning filed 5 May 2023 (this page) | Cleared for impact study | 28.2 acres | ₹236 crore |
In context
8 applications in Indore since January 2022 are in the same category (Industry): 3 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sindhipura, Depalpur, Indore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion in Existing Formulation Plant, M/s Macleods Pharmaceuticals… — environmental approval granted, 50 m away
- Industrial Shed at Plot No. A-10, Industrial Area Pithampur Sector-7, Smart… — under environmental review, 2 km away
- Proposed Greenfield Plant of Integrated paint manufacturing and Synthetic… — under environmental review, 2.4 km away
- Smart Industrial Township Pithampur Sector-07(Investment Region Development… — cleared for impact study, 2.9 km away
- Smart Industrial Park Sector 7 Phase 1 Pithampur, Dhar — lapsed, 2.9 km away
- Residential Township at Pithampur Sector 7 — lapsed, 3.1 km away
- Smart Industrial Township Pithampur Sector-07(Investment Region Development… — cleared for impact study, 3.2 km away
- Industrial Park with Logistic Hub at MPIDC Sector 7 — lapsed, 4.1 km away
All 5 Macleods Pharmaceuticals projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.