Quick answers
What is Laloi Stone Quarry for Temporary Permit?
Laloi Stone Quarry for Temporary Permit is an approved mining project in Laloi, Berasia, Bhopal, Madhya Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Velji Ratna Sorathia Infra Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Jan 2024), as of 27 Nov 2026.
Where is it?
In Laloi, Berasia, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 5 acres.
When was it filed?
The application was filed on 24 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Jan 2024 |
| Application filed | 24 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Velji Ratna Sorathia Infra Private Limited |
| Land area | 5 acres (2 ha) |
| Project cost | ₹1 crore |
| Village / locality | Laloi |
| Taluk / tehsil | Berasia |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00652 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Jan 2024 (this page) | Environmental approval granted | 5 acres | ₹1 crore |
| New project filed 18 Jan 2024 | Lapsed | 5 acres | ₹1 crore |
In context
173 applications in Bhopal since January 2022 are in the same category (Mining): 87 approved, 30 filed or under review, and 56 withdrawn, lapsed or rejected. The approved ones took a median of 21 days from filing to approval. At 5 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Laloi, Berasia, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laloi Stone Quarry for Temporary Permit — lapsed, 0 m away
- Richchai Tank Project — more information requested, 2.1 km away
- Dehriya Kalan Murrum Quarry Lease — lapsed, 4.4 km away
- Kotra Stone Quarry — lapsed, 4.4 km away
- Dillod Stone Quarry — under environmental review, 13.6 km away
- Dillod Stone Quarry — lapsed, 13.6 km away
- Hari Om Stone Crusher — under environmental review, 14.2 km away
- Upgradation Existing Water Supply System At I/A Berasia , Dist Bhoapl MP — more information requested, 17.9 km away
All 6 Velji Ratna Sorathia Infra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.