Quick answers
What is Jhirmir Stone Quarry?
Jhirmir Stone Quarry is a withdrawn mining project in Jhirmir, Jawad, Neemuch, Madhya Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Ramnivas Patidar.
Has it been approved?
No. The application was withdrawn on 7 Nov 2023, so it is no longer under consideration.
Where is it?
In Jhirmir, Jawad, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹15 lakh and a site of 9.9 acres.
When was it filed?
The application was filed on 2 Nov 2023.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 7 Nov 2023 |
| Application filed | 2 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramnivas Patidar |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Jhirmir |
| Taluk / tehsil | Jawad |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00811 |
In context
122 applications in Neemuch since January 2022 are in the same category (Mining): 63 approved, 23 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is smaller than 59% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Jhirmir, Jawad, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Area Janakpur MPIDC — lapsed, 2.5 km away
- Production of semi-refined morphine using Concentrated Poppy Straw Technology — under environmental review, 2.5 km away
- Production of semi-refined morphine using Concentrated Poppy Straw Technology — returned to applicant, 2.5 km away
- Production of semi-refined morphine using Concentrated Poppy Straw Technology — returned to applicant, 2.5 km away
- Production of semi-refined morphine using Concentrated Poppy Straw Technology — cleared for impact study, 2.5 km away
- Dadouli to Ambamata Road — more information requested, 4.2 km away
- Sendeshwar Square to Sendeshwar Mahadev Mandir Road — more information requested, 8.4 km away
- Gandhi Sagar 2 Multi -Villages Scheme, District Mandsaur & Neemuch in Single… — forest land use approved, 9.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.