Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Jan 2024 |
| Application filed | 19 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shivnarayan Malviya |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Undli |
| Taluk / tehsil | Kukshi |
| District | Dhar |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00821 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 Mar 2024 | Lapsed | 4.9 acres | ₹50 lakh |
| New project filed 19 Jan 2024 (this page) | Environmental approval granted | 4.9 acres | ₹50 lakh |
In context
364 applications in Dhar since January 2022 are in the same category (Mining): 203 approved, 35 filed or under review, and 126 withdrawn, lapsed or rejected. The approved ones took a median of 30 days from filing to approval. At 4.9 acres, this one is smaller than 86% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Undli, Kukshi, Dhar, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Undali Stone (Gitti) Quarry — lapsed, 0 m away
- Bharti Airtel ltd. 5G OFC Project Jhabua-Bori-Badkach route DFO Dhar — lapsed, 3.3 km away
- Bharti Airtel ltd. 5G OFC Project Jhabua-Bori-Badkach route DFO Jhabua — lapsed, 3.3 km away
- Construction of of Bagh Caves Approach Road — more information requested, 4 km away
- M/s Ramka Mining Pvt. Ltd. (Birlai Sand Mine Area- 8.0 ha) — environmental approval granted, 5.5 km away
- M/s Ramka Mining Pvt. Ltd. (Birlai Sand Mine Area- 8.0 ha) — cleared for impact study, 5.5 km away
- Birlai - Sand Quarry — under environmental review, 5.7 km away
- Birlai - Sand Quarry — cleared for impact study, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.