Quick answers
What is Pipliya Baag Murrum Quarry for S.T.P?
Pipliya Baag Murrum Quarry for S.T.P is an approved mining project in Pipaliyabagh, Neemuch, Madhya Pradesh. The site covers 6.6 acres.
Who is building it?
The applicant is Kec International Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jul 2023), as of 27 Nov 2026.
Where is it?
In Pipaliyabagh, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹80 lakh and a site of 6.6 acres.
When was it filed?
The application was filed on 4 Jul 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Jul 2023 |
| Application filed | 4 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kec International Limited |
| Land area | 6.6 acres (2.7 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Pipaliyabagh |
| Taluk / tehsil | Neemuch |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00849 |
In context
122 applications in Neemuch since January 2022 are in the same category (Mining): 63 approved, 23 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.6 acres, this one is smaller than 78% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Pipaliyabagh, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Grain based Distillery Plant from 325 KLPD to 850 KLPD and… — environmental approval granted, 550 m away
- Expansion of Grain based Distillery Plant from 325 KLPD to 850 KLPD and… — cleared for impact study, 550 m away
- Expansion of Grain based Ethanol Plant from 325 KLPD to 700 KLPD and… — lapsed, 550 m away
- Neemuch Cheetakheda Jeeran Malhargarh 2 Lane Road — lapsed, 1.3 km away
- Industrial project by M/s. Mangal Synthesis Private Limited — environmental approval granted, 2.9 km away
- Chothkheda Stone Quarry — lapsed, 3.7 km away
- Renewable Energy Component Manufacturing Unit by Dhanuka Biotech Private Limited — environmental approval granted, 4 km away
- Soniyana Laterite Mine — lapsed, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.