Project details
| Official title | Proposed Badarkha Limestone Block (Auctioned Block) over an area of 121.10 Ha with Limestone Production Capacity: 0.46 Million TPA, Soil: 0.1 Million TPA, OB: 0.36 Million TPA, Mineral Reject: 0.1 Million TPA (Total Excavation: 1.02 Million TPA) along with 200 TPH Crusher at Villages: Badarkha, Bigodi and Sannehi Sigti Tehsil: Amarpatan, District: Satna, Madhya Pradesh M/s. Dalmia Cement (Bharat) Limited. |
|---|---|
| Status | Environmental approval granted |
| Status since | 10 Sept 2025 |
| Application filed | 9 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dalmia Cement (Bharat) Limited |
| Land area | 299.2 acres (121.1 ha) |
| Project cost | ₹47 crore |
| Village / locality | Badrkha |
| Taluk / tehsil | Amarpatan |
| District | Satna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00943 |
In context
206 applications in Satna since January 2022 are in the same category (Mining): 105 approved, 29 filed or under review, and 72 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 299.2 acres, this one is larger than 85% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Badrkha, Amarpatan, Satna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jio Digital Fiber Pvt. Ltd. Linear Ofc 5g Project In Row Corridor Of Principal… — lapsed, 3.2 km away
- Bharti Airtel Ltd. 5G OFC Project Rewa-Jinha-Unchera Route DFO Satna — lapsed, 3.6 km away
- Kakalpur Stone Mine of Vansh Pati Singh — lapsed, 6.2 km away
- Amjhar Laterite Deposit — environmental approval granted, 8.6 km away
- Amjhar Scrap Stone Quarry — under environmental review, 8.8 km away
- 132KV DCDS Line from 220KV S/S Kotar to New 132 KV S/S Near Jhinna for Power… — forest land use approved, 9.1 km away
- Amjhar Laterite Deposit — lapsed, 9.4 km away
- Amjhar Laterite Mine of Vikram Singh — lapsed, 9.4 km away
More from Dalmia Cement (Bharat) Limited in Satna
- Clinkerization and Cement Manufacturing Plant — under environmental review
- Proposed Naubasta-Kolard Part-B (Helaundha) Limestone Block (Area 252.256 Ha)… — cleared for impact study
- Proposed Naubasta-Kolard Part-A (Padriya_Rajarwara_Khamhariya Kala) Limestone… — cleared for impact study
4 Dalmia Cement (Bharat) projects in Satna
All 56 Dalmia Cement (Bharat) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.