Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Nov 2023 |
| Application filed | 20 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Barkheda Bondar Stone Quarry |
| Land area | 6.7 acres (2.7 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Naugaon |
| Taluk / tehsil | Ujjain |
| District | Ujjain |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-00965 |
In context
454 applications in Ujjain since January 2022 are in the same category (Mining): 252 approved, 63 filed or under review, and 139 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.7 acres, this one is larger than 59% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Naugaon, Ujjain, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Ujjain Airport: A ₹250-Crore Expansion for Simhastha Kumbh in Madhya Pradesh (6.4 km away).
Other projects nearby
- Nogaon Crusher Stone (Gitti) & M Sand Deposite (Temporary Permit) — initial checks, 250 m away
- Building project by M/S Alkem Laboratories Ltd. — initial checks, 750 m away
- Project by Angeel Oak Speciality Chemtech Pvt Ltd — initial checks, 1000 m away
- Industrial project by Angeel Oak Speciality Chemtech Pvt Ltd — environmental approval granted, 1000 m away
- Industrial project by Chemerix Life Sciences Private Limited — cleared for impact study, 1.1 km away
- New Product Inclusion With Total Capacity of 189.500 Mt & Drop Down of 200 Mt… — initial checks, 1.3 km away
- Manufacturing of Bulk Drugs/Active Pharmaceutical Ingredients… — environmental approval granted, 1.3 km away
- Manufacturing of Bulk Drugs/Active Pharmaceutical Ingredients… — environmental approval granted, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.