Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Feb 2023 |
| Application filed | 27 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Uttam Lodhi |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Bargawan |
| Taluk / tehsil | Jabera |
| District | Damoh |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01079 |
In context
56 applications in Damoh since January 2022 are in the same category (Mining): 38 approved, 9 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 29 days from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Bargawan, Jabera, Damoh, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lakhni Flagstone (Farshi Patthar) Quarry Lease — lapsed, 3.3 km away
- Lakhni Flagstone (Farshi Patthar) Quarry Lease — lapsed, 3.3 km away
- Lakhni Flagstone Quarry, Area-1.0 Ha, at Khasra No 897/2,897/3 and 639,… — lapsed, 3.3 km away
- Construction of New Local Museum Village Nohta — lapsed, 4.8 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 5.9 km away
- Project for Interconnection 33KV Ss Jabera to Kalehara Under Jabera Dc Damoh… — lapsed, 13.3 km away
- Project for Interconnection 33KV Ss Jabera to Kalehara Under Jabera Dc Damoh… — lapsed, 13.3 km away
- Kulpura River Sand Quarry — environmental approval granted, 13.5 km away