Quick answers
What is Nagda Soil Quarry (For Bricks Manufacturing)?
Nagda Soil Quarry (For Bricks Manufacturing) is a proposed mining project in Nagda, Sheopur, Madhya Pradesh. The site covers 4.6 acres.
Who is building it?
The applicant is Shushila Bai.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Nagda, Sheopur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 4.6 acres.
When was it filed?
The application was filed on 30 Oct 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 30 Oct 2023 |
| Application filed | 30 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shushila Bai |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Nagda |
| Taluk / tehsil | Sheopur |
| District | Sheopur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01228 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 6 Sept 2025 | Lapsed | 4.6 acres | ₹20 lakh |
| New project filed 30 Oct 2023 (this page) | More information requested | 4.6 acres | ₹20 lakh |
In context
71 applications in Sheopur since January 2022 are in the same category (Mining): 47 approved, 8 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.6 acres, this one is smaller than 59% of them.
No other mining lease on record is within 500 m of this site; 17 have applied within 5 km.
Where it is
Nagda, Sheopur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nagda Soil Quarry (For Bricks Manufacturing) — lapsed, 0 m away
- Nagda Soil Deposit — environmental approval granted, 600 m away
- Nagda Soil Quarry (For Making Chimeny Bricks) — lapsed, 600 m away
- Nagda Soil Quarry (For Making Chimeny Bricks) — lapsed, 600 m away
- Nagda Boulder, Gitti & M-sand Quarry — environmental approval granted, 1.7 km away
- Jatkheda Soil Quarry (For Making Chimeny Bricks) — lapsed, 2 km away
- Jaatkheda Soil Quarry (for making bricks) — environmental approval granted, 2.1 km away
- Jatkheda Soil Quarry (For Making Chimeny Bricks) — lapsed, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.