Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Apr 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Parvez Khan |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Jalalkheri |
| Taluk / tehsil | Ujjain |
| District | Ujjain |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01750 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 21 Apr 2025 (this page) | Cleared for impact study | 4.9 acres | ₹20 lakh |
| New project filed 20 Oct 2024 | Lapsed | 4.9 acres | ₹20 lakh |
In context
454 applications in Ujjain since January 2022 are in the same category (Mining): 252 approved, 63 filed or under review, and 139 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 64% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 26.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.
Where it is
Jalalkheri, Ujjain, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jalalkhedi Stone (Gitti) Quarry — lapsed, 0 m away
- Jalalkhedi Stone Gitti Quarry — under environmental review, 100 m away
- Jalalkhedi Stone (Gitti) Project — cleared for impact study, 200 m away
- Jhalalkhedi Stone Quarry — cleared for impact study, 250 m away
- Jhalalkhedi Stone Quarry — lapsed, 250 m away
- Jalalkhedi Stone Gitti Quarry — lapsed, 300 m away
- Jalalkhedi Stone Gitti Project — lapsed, 300 m away
- Jalalkhedi Stone Gitti Quarry — cleared for impact study, 300 m away