Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 Feb 2024 |
| Application filed | 30 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dammu Raikwar |
| Land area | 14.8 acres (6 ha) |
| Project cost | ₹27 lakh |
| Village / locality | Puraina |
| Taluk / tehsil | Pawai |
| District | Panna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01771 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Jan 2025 | Lapsed | 14.8 acres | ₹27 lakh |
| Early planning filed 30 Jan 2024 (this page) | Cleared for impact study | 14.8 acres | ₹27 lakh |
In context
102 applications in Panna since January 2022 are in the same category (Mining): 53 approved, 27 filed or under review, and 22 withdrawn, lapsed or rejected. The approved ones took a median of 31 days from filing to approval. At 14.8 acres, this one is larger than 55% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Puraina, Pawai, Panna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Purena – River Sand Quarry — lapsed, 0 m away
- "Construction of the Residential Colony with a Plot Area of 14 Ha and a… — environmental approval granted, 2.3 km away
- Proposed increase in Clinker Production Capacity under para 7 (ii) (b) of the… — initial checks, 2.8 km away
- Amendment in EC for extension in OLBC installation timeline for JK Cement… — environmental approval granted, 2.8 km away
- Amendment in Existing EC granted for Clinker Production 6.6 Million TPA (2 x… — environmental approval granted, 2.8 km away
- Transfer of EC (Name change) from M/s. Jaykaycem (Central) Ltd to M/s. J.K.… — environmental approval granted, 2.8 km away
- Transfer of EC vide letter no. IA-J-11011/224/2016-IA-II (I) dtd 02nd March,… — lapsed, 2.8 km away
- Transfer of Environment Clearance vide letter no. IA-J-11011/224/2016-IA-II… — withdrawn, 2.8 km away
More from Dammu Raikwar in Panna
- Gudha - River Sand Quarry — under environmental review
- Sighasar – River Sand Quarry — under environmental review
- Sunvani Khurd - River Sand Quarry — under environmental review
- Pipariya – River Sand Quarry — lapsed
- Badkherakala – Sand Quarry — under environmental review
- Kolkarhiya – River Sand Quarry — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.