Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jun 2023 |
| Application filed | 6 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Sayaji Hotels Limited |
| Land area | 3.8 acres (1.6 ha) |
| Project cost | ₹76.8 crore |
| Village / locality | Nipanya |
| Taluk / tehsil | Indore |
| District | Indore |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01777 |
In context
81 applications in Indore since January 2022 are in the same category (Buildings & townships): 48 approved, 22 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 3.8 acres, this one is smaller than 51% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nipanya, Indore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of "Amber Hotel and Convention Centre" — environmental approval granted, 0 m away
- BCM Imperial Tower — environmental approval granted, 1.1 km away
- Development Of Town Planning Scheme of TPS – 5, Indore, M.P — more information requested, 1.6 km away
- Residential Project "The Vertical " by Shri GK Creations — under environmental review, 2 km away
- Proposed residential Project "Victoria Harmony" — lapsed, 2.3 km away
- Proposed Construction of High-Rise Residential Project "elite Fortune" — environmental approval granted, 2.4 km away
- Residential cum Commercial Project " Shekhar Global" — environmental approval granted, 2.5 km away
- Sheraton Hotel — environmental approval granted, 2.5 km away
More from Sayaji Hotels Limited in Indore
- Proposed Expansion of "Amber Hotel and Convention Centre" — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.