Quick answers
What is Karwakhedi Stone Mine?
Karwakhedi Stone Mine is an approved mining project in Karwakheri, Tal, Ratlam, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Jahid Hussain.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jun 2023), as of 27 Nov 2026.
Where is it?
In Karwakheri, Tal, Ratlam, Madhya Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 30 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Jun 2023 |
| Application filed | 30 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jahid Hussain |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Karwakheri |
| Taluk / tehsil | Tal |
| District | Ratlam |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-01857 |
In context
261 applications in Ratlam since January 2022 are in the same category (Mining): 143 approved, 45 filed or under review, and 73 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.9 acres, this one is smaller than 69% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Karwakheri, Tal, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Malya Stone (Gitti & M-sand) Quarry — environmental approval granted, 4.1 km away
- Malya Stone (Gitti & M-sand) Quarry — lapsed, 4.1 km away
- Malya Stone Mine — lapsed, 4.5 km away
- Malya Stone Mine — initial checks, 4.5 km away
- Fatehpur Sand Quarry — environmental approval granted, 5.7 km away
- Fatehpur Sand Quarry — cleared for impact study, 5.7 km away
- Kitu Khedi Sand Quarry (Quarry Lease; Area 5.0 ha, Production 3600 m3/year at… — environmental approval granted, 7.6 km away
- Uni Sand Quarry (Quarry Lease); Area 5.0 ha, Production 4050 m3/year — environmental approval granted, 8.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.