What is Developing? Open the mapMap

Cleared for impact studyRoads & highways · Indore, Madhya Pradesh

Six Laning With Service Road on Both Sides of Indore Ring Road From Design Km 0+000 Near Village Khandwa on NH-52 to Km 140+388 End at Bhardala in the State of Madhya Pradesh Under Bharatmala Pariyojana.

Six Laning With Service Road on Both Sides of Indore Ring Road From Design Km 0+000 Near Village Khandwa on NH-52 to Km 140+388 End at Bhardala in the State of Madhya Pradesh Under Bharatmala Pariyojana is a proposed road project in Dhataria, Sawer, Indore, Madhya Pradesh. Its stated project cost is ₹6,230.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 26 Oct 2023).

See it on the live map All projects in Indore

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusCleared for impact study
Status since26 Oct 2023
Application filed24 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorRoads & highways
ApplicantNational Highways Authority of India (NHAI)
Project cost₹6,230.5 crore
Village / localityDhataria
Taluk / tehsilSawer
DistrictIndore
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-02093

In context

10 applications in Indore since January 2022 are in the same category (Roads & highways): 5 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhataria, Sawer, Indore, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from National Highways Authority of India (NHAI) in Indore

6 National Highways Authority of India (NHAI) projects in Indore
All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.