Quick answers
What is this project?
Proposed 120 KLD Grain Based Ethanol plantalong with 3.4MW Co-generation Power Plant at Khasra No. 12(S), 13/1(S), 13/2(S), 13/2(S), 13/3(S) & 15(S) Village – Mojha Changheri, Tehsil- Malhargarh, District- Mandsaur (M.P) by M/s Kripa Biotech LLP is an approved industrial project in Chaldu, Jiran, Neemuch, Madhya Pradesh. The site covers 12.3 acres.
Who is building it?
The applicant is Kripa Biotech LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Feb 2023), as of 27 Nov 2026.
Where is it?
In Chaldu, Jiran, Neemuch, Madhya Pradesh.
How big is it?
It has a stated cost of ₹110 crore and a site of 12.3 acres.
When was it filed?
The application was filed on 11 Feb 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Feb 2023 |
| Application filed | 11 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Kripa Biotech LLP |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹110 crore |
| Village / locality | Chaldu |
| Taluk / tehsil | Jiran |
| District | Neemuch |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02096 |
In context
17 applications in Neemuch since January 2022 are in the same category (Industry): 12 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.3 acres, this one is smaller than 76% of them.
Where it is
Chaldu, Jiran, Neemuch, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dhokalkheda Stone (Gitti) & M Sand Quarry (4.00 Ha.) — initial checks, 5.7 km away
- Dhokalkheda Stone (Gitti) & M Sand Quarry (4.00 Ha.) — under environmental review, 5.7 km away
- Kuchdod Stone (Gitti) Quarry — environmental approval granted, 5.9 km away
- Kuchdod Stone (Gitti) Quarry — environmental approval granted, 5.9 km away
- Kuchdod Stone (Gitti) Quarry — lapsed, 5.9 km away
- Kuchdod Stone (Gitti) Quarry — cleared for impact study, 5.9 km away
- Kuchdod Stone (Gitti) Quarry — lapsed, 6.3 km away
- Kuchdod Stone (Gitti) & M-Sand Quarry-New — lapsed, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.