Quick answers
What is Mining Project for Nandu Sand Mine Quarry?
Mining Project for Nandu Sand Mine Quarry is an approved mining project in Nandu, Ghoda Dongri, Betul, Madhya Pradesh. The site covers 7.2 acres.
Who is building it?
The applicant is Pramod Dhabai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Aug 2023), as of 27 Nov 2026.
Where is it?
In Nandu, Ghoda Dongri, Betul, Madhya Pradesh.
How big is it?
It has a stated cost of ₹57 lakh and a site of 7.2 acres.
When was it filed?
The application was filed on 16 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Aug 2023 |
| Application filed | 16 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pramod Dhabai |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹57 lakh |
| Village / locality | Nandu |
| Taluk / tehsil | Ghoda Dongri |
| District | Betul |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02116 |
In context
166 applications in Betul since January 2022 are in the same category (Mining): 118 approved, 16 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 7.2 acres, this one is larger than 64% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Nandu, Ghoda Dongri, Betul, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chikhahli Amadhana Sand Mine Quarry — not approved, 1.4 km away
- Chikhahli Amadhana Sand Mine Quarry — cleared for impact study, 1.4 km away
- Bsnl 4g Saturation Project — forest land use approved, 3.4 km away
- New 33/11 KV Substation Ratanpur (Rdss) — forest land use approved, 4.9 km away
- Fulgohan Stone Quarry — environmental approval granted, 6 km away
- Sadakwada Stone Quarry — environmental approval granted, 7 km away
- 4g Saturation Project Under Usof Project — lapsed, 8.3 km away
- Diversion of 23.4011 Ha Forest Land for Proposed 3rd Railway Line Between… — under forest review, 10.5 km away
More from Pramod Dhabai in Betul
- Malwar Sand Mine Quarry — environmental approval granted
- Barchi Sand Mine Quarry — not approved
- Banspur/Shivsagar Sand Mine Quarry — environmental approval granted
- Sangwani Sand Mine Quarry — environmental approval granted
- Harnya Sand Mine Quarry — environmental approval granted
- Sontalai/Samrattdhana Sand Mine Quarry — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.