Quick answers
What is this project?
Ghusiya Mal Crusher Stone (for Making Gitti) Quarry of M/s Afcons Infrastructure Limited is an approved mining project in Ghusiya, Dindori, Madhya Pradesh. The site covers 9.8 acres.
Who is building it?
The applicant is Afcons Infrastructure Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Oct 2023), as of 27 Nov 2026.
Where is it?
In Ghusiya, Dindori, Madhya Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 9.8 acres.
When was it filed?
The application was filed on 5 Oct 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Oct 2023 |
| Application filed | 5 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Afcons Infrastructure Limited |
| Land area | 9.8 acres (4 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Ghusiya |
| Taluk / tehsil | Dindori |
| District | Dindori |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02169 |
In context
63 applications in Dindori since January 2022 are in the same category (Mining): 28 approved, 14 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.8 acres, this one is larger than 67% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Ghusiya, Dindori, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Singarpur Ryt Stone Mining Project of M/s Afcons Infrastructure Ltd — environmental approval granted, 1.6 km away
- Barkhoh Raiyat Gitti & Muram Mines — environmental approval granted, 5.5 km away
- Raghavpur Multi-purpose Project — environmental approval granted, 7.9 km away
- Raghavpur Multi-purpose Project — cleared for impact study, 7.9 km away
- Ganeshpur Dhangaon Ryt Crusher Stone Quarry Project — environmental approval granted, 8.8 km away
- Raghavpur Multipurpose pROJECT — forest land use approved, 9.5 km away
- Ganeshpur Dhangaon Ryt Crusher Stone Quarry of Shri Bheem Awadhiya — environmental approval granted, 9.6 km away
- Kisalpuri Metal Stone Quarry Project — environmental approval granted, 12.7 km away
More from Afcons Infrastructure Limited in Dindori
- Singarpur Ryt Stone Mining Project of M/s Afcons Infrastructure Ltd — environmental approval granted