Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Dec 2023 |
| Application filed | 16 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shailendra Gurjar |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹50 lakh |
| Village / locality | R F |
| Taluk / tehsil | Morena |
| District | Morena |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02209 |
In context
168 applications in Morena since January 2022 are in the same category (Mining): 94 approved, 43 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 16 days from filing to approval. At 7.4 acres, this one is larger than 56% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
R F, Morena, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Grain Based Distillery Plant of 200 KLD (100 KLD in Phase-1 + 100 KLD in… — environmental approval granted, 2.4 km away
- Change in Product Mix With No Increase in Pollution Load.(Grain Base Fuel… — initial checks, 4.6 km away
- Clinker Grinding Units (200 TPD) — environmental approval granted, 4.7 km away
- Clinker Grinding Units (200 TPD) — cleared for impact study, 4.7 km away
- Industrial project by M/s. Shri Vinayak Surgi Plast Pvt Ltd — environmental approval granted, 5.2 km away
- Industrial project by M/s. Shri Vinayak Surgi Plast Pvt Ltd — cleared for impact study, 5.2 km away
- Proposed API & Drug Intermediates Unit — under environmental review, 5.2 km away
- Dhanela Stone Quarry — under environmental review, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.