Quick answers
What is Dhabaipada Stone Mine?
Dhabaipada Stone Mine is a proposed mining project in Dhabaipara, Ratlam, Madhya Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Pawan Kumawat.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Feb 2025), as of 27 Nov 2026.
Where is it?
In Dhabaipara, Ratlam, Madhya Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 9.9 acres.
When was it filed?
The application was filed on 19 Feb 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Feb 2025 |
| Application filed | 19 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Pawan Kumawat |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Dhabaipara |
| Taluk / tehsil | Ratlam |
| District | Ratlam |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02628 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Aug 2026 | Under environmental review | 9.9 acres | ₹50 lakh |
| Early planning filed 19 Feb 2024 (this page) | Cleared for impact study | 9.9 acres | ₹50 lakh |
In context
261 applications in Ratlam since January 2022 are in the same category (Mining): 143 approved, 45 filed or under review, and 73 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9.9 acres, this one is larger than 81% of them.
No other mining lease on record is within 500 m of this site; 31 have applied within 5 km.
Where it is
Dhabaipara, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dhabaipada Stone Mine — under environmental review, 0 m away
- Dhabaipada Stone Mine — environmental approval granted, 550 m away
- Dhabaipada Stone Mine — cleared for impact study, 550 m away
- Dhabaipada Stone Mine — cleared for impact study, 1000 m away
- Dhabaipada Stone Mine — under environmental review, 1000 m away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — lapsed, 1.1 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 1.2 km away
- Dhabaipada Stone Quarry — lapsed, 1.4 km away