Quick answers
What is Sanwer Micro Lift Irrigation Scheme?
Sanwer Micro Lift Irrigation Scheme is an approved water and irrigation project in Kanar Pf, Bagli, Dewas, Madhya Pradesh. The site covers 159.5 acres.
Who is building it?
The applicant is Chief Engineer Lower Narmada Projects.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Apr 2023), as of 27 Nov 2026.
Where is it?
In Kanar Pf, Bagli, Dewas, Madhya Pradesh.
How big is it?
It has a stated cost of ₹3,046.7 crore and a site of 159.5 acres.
When was it filed?
The application was filed on 12 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Apr 2023 |
| Application filed | 12 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Chief Engineer Lower Narmada Projects |
| Land area | 159.5 acres (64.6 ha) |
| Project cost | ₹3,046.7 crore |
| Village / locality | Kanar Pf |
| Taluk / tehsil | Bagli |
| District | Dewas |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02657 |
In context
18 applications in Dewas since January 2022 are in the same category (Water & irrigation): 10 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 159.5 acres, this one is larger than 65% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanar Pf, Bagli, Dewas, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Government of India- 4G Saturation Project - BADCHHAPRA — lapsed, 3 km away
- 4G Sturation Project -BADCHHAPRA — forest land use approved, 3 km away
- Pandutalab Marble Mine — lapsed, 6.7 km away
- Pandutalab Marble Mine-3.410ha — lapsed, 7 km away
- Government of India- 4G Saturation Project - Patadipala — lapsed, 7.4 km away
- 4G Saturation Project — forest land use approved, 7.4 km away
- Patadipala To Lohara pipliya Whya Udaipura road — lapsed, 8.7 km away
- Punjpura Barawah forest — lapsed, 10.5 km away
More from Chief Engineer Lower Narmada Projects in Dewas
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.