Quick answers
What is Dongratola Quarry Lease?
Dongratola Quarry Lease is a lapsed mining project in Dongratola, Kotma, Anuppur, Madhya Pradesh. The site covers 4 acres.
Who is building it?
The applicant is Amit Minerals.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Dongratola, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹46 lakh and a site of 4 acres.
When was it filed?
The application was filed on 11 Dec 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Dongratola Quarry Lease
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 11 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Amit Minerals |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹46 lakh |
| Village / locality | Dongratola |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-02860 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Dec 2024 | Lapsed | 4 acres | ₹46 lakh |
| New project filed 11 Dec 2023 (this page) | Lapsed | 4 acres | ₹46 lakh |
In context
134 applications in Anuppur since January 2022 are in the same category (Mining): 45 approved, 29 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4 acres, this one is smaller than 76% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Dongratola, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dongratola Quarry Lease — lapsed, 0 m away
- Bifurcation of 33 KV Feeder from 132 KV EHV S/S to 33/11 KV S/S Funga — lapsed, 4.3 km away
- Urtan North Coal Block (Normative Capacity: 0.6 MTPA, PRC: 0.90 MTPA) &… — environmental approval granted, 4.5 km away
- Bifurcation of 33 KV Kotma old feeder from 132 KV EHV S/S to 33/11 KV S/S Parasi — lapsed, 4.5 km away
- Urtan Coal Mine (Normative Capacity: 0.65 MTPA, Peak Rated Capacity: 0.975 MTPA) — environmental approval granted, 4.6 km away
- Bifurcation of 33 KV Kotma old feeder from 132 KV EHV S/S to 33/11 KV S/S… — lapsed, 5.3 km away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — under environmental review, 5.3 km away
- Lamatola Coal Block, District Anuppur, Madhya Pradesh proposed by M/s ACC Ltd — forest land use approved, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.