What is Developing? Open the mapMap

Initial checksFuel stations · Narsimhapur, Madhya Pradesh

No Increase in Pollution Loadwrt Capacity Expansion in Fuel Ethanol Production From 60 Kld to 80 Kld by Using B Heavy Molasses ( C2h5oh) and 90 Kld by Using Syrup ( C2h5oh) Through Change in Raw Mix

No Increase in Pollution Loadwrt Capacity Expansion in Fuel Ethanol Production From 60 Kld to 80 Kld by Using B Heavy Molasses ( C2h5oh) and 90 Kld by Using Syrup ( C2h5oh) Through Change in Raw Mix is a proposed fuel station in Pondar, Gadarwara, Narsimhapur, Madhya Pradesh. The site covers 35.3 acres. As of 27 Nov 2026, its status is “Initial checks” (since 28 Dec 2024).

See it on the live map All projects in Narsimhapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusInitial checks
Status since28 Dec 2024
Application filed28 Dec 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorFuel stations
ApplicantNarmada Sugar Private Limited
Land area35.3 acres (14.3 ha)
Village / localityPondar
Taluk / tehsilGadarwara
DistrictNarsimhapur
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-03210

In context

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pondar, Gadarwara, Narsimhapur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Narmada Sugar Private Limited in Narsimhapur

All 4 Narmada Sugar projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.