Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 9 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashish Singh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Diapipar |
| Taluk / tehsil | Sohagpur |
| District | Shahdol |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03459 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 9 Dec 2024 (this page) | Lapsed | 2.5 acres | ₹30 lakh |
| New project filed 4 Jan 2024 | Lapsed | 2.5 acres | ₹30 lakh |
In context
155 applications in Shahdol since January 2022 are in the same category (Mining): 65 approved, 26 filed or under review, and 64 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 85% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Diapipar, Sohagpur, Shahdol, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diyapipar Stone Quarry — lapsed, 0 m away
- Karri Stone Quarry — lapsed, 450 m away
- Karri Stone Quarry — environmental approval granted, 450 m away
- Diyapipar Stone Quarry — lapsed, 2.2 km away
- Diyapipar Stone Quarry — lapsed, 2.2 km away
- Diyapeepar Stone Quarry (Temporary Permit for Road Construction) — environmental approval granted, 2.3 km away
- Forest clearence for electrification of PVTG Communities — lapsed, 3 km away
- Rohaniya Sand Quarry — environmental approval granted, 4.4 km away
More from Ashish Singh in Shahdol
- Karri Stone Quarry — environmental approval granted
- Karri Stone Quarry — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.