Quick answers
What is this project?
Parichchha Ahir Gitty & M- Sand Stone Quarry (Temporary Permit) is a lapsed mining project in Parichha, Pohri, Shivpuri, Madhya Pradesh. The site covers 9.9 acres.
Who is building it?
The applicant is Anil Construction Company.
Has it been approved?
No. The application was lapsed on 22 Mar 2026, so it is no longer under consideration.
Where is it?
In Parichha, Pohri, Shivpuri, Madhya Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 9.9 acres.
When was it filed?
The application was filed on 29 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Parichchha Ahir Gitty & M- Sand Stone Quarry (Temporary Permit)
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Mar 2026 |
| Application filed | 29 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Anil Construction Company |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Parichha |
| Taluk / tehsil | Pohri |
| District | Shivpuri |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03463 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 29 Mar 2024 (this page) | Lapsed | 9.9 acres | ₹35 lakh |
| New project filed 16 Nov 2023 | Environmental approval granted | 9.9 acres | ₹35 lakh |
In context
149 applications in Shivpuri since January 2022 are in the same category (Mining): 88 approved, 29 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 9.9 acres, this one is larger than 60% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Parichha, Pohri, Shivpuri, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Parichchha Ahir Gitty & M- Sand Stone Quarry (Temporary Permit) — environmental approval granted, 0 m away
- Parichchha Ahir Stone & M-Sand Quarry — under environmental review, 950 m away
- Parichha Kirar Stone Quarry — environmental approval granted, 1.7 km away
- Parichha Kirar Stone Quarry — cleared for impact study, 1.7 km away
- Parichchha Ahir Stone Mine (Temporary Permit) — environmental approval granted, 1.8 km away
- Jio Digital Fiber Pvt Ltd Linear OFC 5G Project in ROW Corridor of Principal… — forest land use approved, 7.4 km away
- Ramabasai Murrum Quarry — environmental approval granted, 11.2 km away
- Ramabasai Murrum Quarry — lapsed, 11.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.