One of 2 filings for this project. The project's main page, with every filing and where each stands: Rafadpur Stone Quarry
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 12 May 2024 |
| Application filed | 2 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ashok Gupta |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Raphadpura |
| Taluk / tehsil | Pichhore Or Dabra |
| District | Gwalior |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03586 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 20 May 2025 | Cleared for impact study | 2 acres | ₹12 lakh |
| Early planning filed 2 May 2024 (this page) | Cleared for impact study | 2 acres | ₹12 lakh |
In context
240 applications in Gwalior since January 2022 are in the same category (Mining): 154 approved, 17 filed or under review, and 69 withdrawn, lapsed or rejected. The approved ones took a median of 11 days from filing to approval. At 2 acres, this one is smaller than 96% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 285.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 46 mining leases have applied within 5 km.
Where it is
Raphadpura, Pichhore Or Dabra, Gwalior, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rafadpur Stone Quarry — cleared for impact study, 0 m away
- Rafatpura Stone Quarry — cleared for impact study, 150 m away
- Rafadpur Stone Mine — cleared for impact study, 200 m away
- Rafadpur Stone Mine — lapsed, 200 m away
- Biloua Stone (Gitti) Quarry — lapsed, 200 m away
- Bilaua Stone (Gitti) Quarry — cleared for impact study, 200 m away
- Rafatpur Crusher Stone Mines of M/s Sudama Construction Pvt. Ltd. — under environmental review, 250 m away
- Bilaua Gitti Stone Mine — cleared for impact study, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.