Quick answers
What is this project?
Vijyendra Singh Raghuvanshi Piproda Khurd Stone mine for making Gitti Area-2.0 ha is a lapsed mining project in Piproda, Guna, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Vijendra Raghuwanshi.
Has it been approved?
No. The application was lapsed on 26 Jun 2025, so it is no longer under consideration.
Where is it?
In Piproda, Guna, Madhya Pradesh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 27 Apr 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Jun 2025 |
| Application filed | 27 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijendra Raghuwanshi |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Piproda |
| Taluk / tehsil | Guna |
| District | Guna |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03608 |
In context
95 applications in Guna since January 2022 are in the same category (Mining): 59 approved, 18 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 91% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 44.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Piproda, Guna, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Vijendra Singh Raghuvashi Piproda Khurd Stone Mine — lapsed, 0 m away
- Piproda Khurd Stone Quarry — cleared for impact study, 200 m away
- Piproda Khurd Stone (Gitti & M-Sand) Quarry — under environmental review, 250 m away
- Piproda Khurd Stone Quarry — under environmental review, 300 m away
- Piproda Khurd Stone Quarry — cleared for impact study, 300 m away
- Piproda Khurd Stone Quarry — cleared for impact study, 400 m away
- Piprodakhurd Stone Quarry — lapsed, 400 m away
- Piparodakhurd Crusher Stone Quarry — more information requested, 400 m away
More from Vijendra Raghuwanshi in Guna
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.