Quick answers
What is Mining project by M/S Neeraj Stone Crusher?
This lapsed mining project by M/S Neeraj Stone Crusher is in Dogara Tola, Kotma, Anuppur, Madhya Pradesh. The site covers 3.3 acres.
Who is building it?
The applicant is Rajesh Kumar Motwani.
Has it been approved?
No. The application was lapsed on 20 Feb 2025, so it is no longer under consideration.
Where is it?
In Dogara Tola, Kotma, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 3.3 acres.
When was it filed?
The application was filed on 3 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 3 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajesh Kumar Motwani |
| Land area | 3.3 acres (1.3 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Dogara Tola |
| Taluk / tehsil | Kotma |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03705 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Dec 2024 (this page) | Lapsed | 3.3 acres | ₹25 lakh |
| New project filed 26 Oct 2024 | Lapsed | 3.3 acres | ₹25 lakh |
In context
134 applications in Anuppur since January 2022 are in the same category (Mining): 45 approved, 29 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.3 acres, this one is smaller than 86% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 12.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Dogara Tola, Kotma, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/S Neeraj Stone Crusher — lapsed, 0 m away
- Dongaria Tola Stone Quarry — lapsed, 0 m away
- Dongaria Tola Stone (Gitti) & Boulder Quarry — under environmental review, 300 m away
- Dongaria Khurd Stone Quarry — more information requested, 1.8 km away
- Transfer of Environment Clearance from Radiant Coal Beneficiation Pvt. Ltd. to… — not approved, 1.8 km away
- Dogariya Khurd Stone Quarry — under environmental review, 1.8 km away
- Dogariya Khurd Stone Quarry — environmental approval granted, 1.8 km away
- Dongaria Khurd Stone Quarry — lapsed, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.