Quick answers
What is Kusahi Stone Quarry?
Kusahi Stone Quarry is a lapsed mining project in Kusahi, Chitrangi, Singrauli, Madhya Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Prabhakar Baghel.
Has it been approved?
No. The application was lapsed on 22 Feb 2025, so it is no longer under consideration.
Where is it?
In Kusahi, Chitrangi, Singrauli, Madhya Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 19 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Feb 2025 |
| Application filed | 19 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Prabhakar Baghel |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Kusahi |
| Taluk / tehsil | Chitrangi |
| District | Singrauli |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03794 |
In context
268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 84% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kusahi, Chitrangi, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kusahi Stone Quarry — lapsed, 500 m away
- Permission for Boring Work (Soil STATA Investigation) Under Songharial… — under wildlife review, 3 km away
- Khamariya Kalan Sand Quarry — environmental approval granted, 4.9 km away
- Rehi Sand Deposit — lapsed, 6.2 km away
- Rehi Sand Deposit — cleared for impact study, 6.2 km away
- Bharra to Redi Road Length 4.00 Km. — forest land use approved, 6.8 km away
- 765 kV Vindhyachal Pool- Prayagraj D/c line — under forest review, 11.9 km away
- Waidhan-2 Multi Village Rural Water Supply Scheme — forest land use approved, 12.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.