Quick answers
What is Soikalan Soil Quarry (For Bricks Manufacturing )?
Soikalan Soil Quarry (For Bricks Manufacturing ) is a proposed mining project in Soi Kalan, Sheopur, Madhya Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Govind Samadhiya.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Soi Kalan, Sheopur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹15 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 5 Apr 2024.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 27 May 2024 |
| Application filed | 5 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Govind Samadhiya |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Soi Kalan |
| Taluk / tehsil | Sheopur |
| District | Sheopur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03853 |
In context
71 applications in Sheopur since January 2022 are in the same category (Mining): 47 approved, 8 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Soi Kalan, Sheopur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Soikalan Soil Quarry (For Making Bricks) — lapsed, 2.9 km away
- Soikalan Soil Quarry (For Making Bricks) — lapsed, 2.9 km away
- Soikalan Soil Quarry — environmental approval granted, 3.7 km away
- Soikalan Soil Quarry — lapsed, 3.7 km away
- Roopnagar Soil Quarry (for making bricks) — environmental approval granted, 4.2 km away
- Roopnagar Soil Quarry (For Making Chimeny Bricks) — lapsed, 4.2 km away
- Soi Kalan Soil Quarry — environmental approval granted, 4.3 km away
- Raipura Soil Quarry Lease (For Brick Making Thorough Chimney) — environmental approval granted, 4.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.