What is Developing? Open the mapMap

WithdrawnMining · Singrauli, Madhya Pradesh

4 Million Tons Per Annum (MTPA) Coal Washery

4 Million Tons Per Annum (MTPA) Coal Washery is a withdrawn mining project in Daga, Deosar, Singrauli, Madhya Pradesh. The site covers 24.7 acres. Its stated project cost is ₹63.3 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 4 Mar 2024).

See it on the live map All projects in Singrauli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is 4 Million Tons Per Annum (MTPA) Coal Washery?

4 Million Tons Per Annum (MTPA) Coal Washery is a withdrawn mining project in Daga, Deosar, Singrauli, Madhya Pradesh. The site covers 24.7 acres.

Who is building it?

The applicant is Raipur Coal Feeder Private Limited.

Has it been approved?

No. The application was withdrawn on 4 Mar 2024, so it is no longer under consideration.

Where is it?

In Daga, Deosar, Singrauli, Madhya Pradesh.

How big is it?

It has a stated cost of ₹63.3 crore and a site of 24.7 acres.

When was it filed?

The application was filed on 11 Jan 2024.

One of 3 filings for this project. The project's main page, with every filing and where each stands: 4 Million Tons Per Annum (MTPA) Coal washery

Project details

StatusWithdrawn
Status since4 Mar 2024
Application filed11 Jan 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantRaipur Coal Feeder Private Limited
Land area24.7 acres (10 ha)
Project cost₹63.3 crore
Village / localityDaga
Taluk / tehsilDeosar
DistrictSingrauli
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-03939

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Jul 2025Returned to applicant24.7 acres₹63.3 crore
Early planning filed 11 Jan 2024 (this page)Withdrawn24.7 acres₹63.3 crore
New project filed 11 Jan 2024Returned to applicant24.7 acres₹63.3 crore

In context

268 applications in Singrauli since January 2022 are in the same category (Mining): 152 approved, 40 filed or under review, and 76 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24.7 acres, this one is larger than 72% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 32.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.

Where it is

Daga, Deosar, Singrauli, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Raipur Coal Feeder Private Limited in Singrauli

All 4 Raipur Coal Feeder projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.