Cleared for impact studyIndustry · Balaghat, Madhya Pradesh

Greenfield Project of "Grain Based Distillery Plant of 240 KLD by M/s Nayara Energy Limited

Greenfield Project of "Grain Based Distillery Plant of 240 KLD by M/s Nayara Energy Limited is a proposed industrial project in Paraswada, Kirnapur, Balaghat, Madhya Pradesh. The site covers 51.6 acres. Its stated project cost is ₹281.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 16 Jun 2024).

See it on the live map All projects in Balaghat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Greenfield Project of "Grain Based Distillery Plant of 240 KLD by M/s Nayara Energy Limited is a proposed industrial project in Paraswada, Kirnapur, Balaghat, Madhya Pradesh. The site covers 51.6 acres.

Who is building it?

The applicant is Nayara Energy Limited Industrial Area Phase Viii Mohali.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 16 Jun 2024), as of 27 Nov 2026.

Where is it?

In Paraswada, Kirnapur, Balaghat, Madhya Pradesh.

How big is it?

It has a stated cost of ₹281.5 crore and a site of 51.6 acres.

When was it filed?

The application was filed on 30 May 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project of "Grain Based Distillery Plant of 240 KLD by M/s Nayara Energy…

Project details

Official titleGreenfield Project of "Grain Based Distillery Plant of 240 KLD along with 4.95 MW Co-Generation Power Plant" by M/s Nayara Energy Limited
StatusCleared for impact study
Status since16 Jun 2024
Application filed30 May 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNayara Energy Limited Industrial Area Phase Viii Mohali
Land area51.6 acres (20.9 ha)
Project cost₹281.5 crore
Village / localityParaswada
Taluk / tehsilKirnapur
DistrictBalaghat
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-03955

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 25 Sept 2024Environmental approval granted51.6 acres₹281.5 crore
Early planning filed 30 May 2024 (this page)Cleared for impact study51.6 acres₹281.5 crore

In context

10 applications in Balaghat since January 2022 are in the same category (Industry): 4 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. At 51.6 acres, this one is larger than 80% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Paraswada, Kirnapur, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.