Quick answers
What is this project?
Greenfield Project of "Grain Based Distillery Plant of 240 KLD by M/s Nayara Energy Limited is a proposed industrial project in Paraswada, Kirnapur, Balaghat, Madhya Pradesh. The site covers 51.6 acres.
Who is building it?
The applicant is Nayara Energy Limited Industrial Area Phase Viii Mohali.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Jun 2024), as of 27 Nov 2026.
Where is it?
In Paraswada, Kirnapur, Balaghat, Madhya Pradesh.
How big is it?
It has a stated cost of ₹281.5 crore and a site of 51.6 acres.
When was it filed?
The application was filed on 30 May 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Greenfield Project of "Grain Based Distillery Plant of 240 KLD by M/s Nayara Energy…
Project details
| Official title | Greenfield Project of "Grain Based Distillery Plant of 240 KLD along with 4.95 MW Co-Generation Power Plant" by M/s Nayara Energy Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 16 Jun 2024 |
| Application filed | 30 May 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Nayara Energy Limited Industrial Area Phase Viii Mohali |
| Land area | 51.6 acres (20.9 ha) |
| Project cost | ₹281.5 crore |
| Village / locality | Paraswada |
| Taluk / tehsil | Kirnapur |
| District | Balaghat |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-03955 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 25 Sept 2024 | Environmental approval granted | 51.6 acres | ₹281.5 crore |
| Early planning filed 30 May 2024 (this page) | Cleared for impact study | 51.6 acres | ₹281.5 crore |
In context
10 applications in Balaghat since January 2022 are in the same category (Industry): 4 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. At 51.6 acres, this one is larger than 80% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Paraswada, Kirnapur, Balaghat, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of "Grain Based Distillery Plant of 240 KLD by M/s Nayara… — environmental approval granted, 0 m away
- Mundesara Sand Quarry — lapsed, 2.8 km away
- Mundesara Sand Quarry — cleared for impact study, 2.8 km away
- Pangaon Sand Quarry — environmental approval granted, 4.3 km away
- FERRO ALLOY UNIT ( Ferro Manganese, Silico Manganese, Ferro Silicon, Pig Iron,… — environmental approval granted, 7 km away
- FERRO ALLOY UNIT ( Ferro Manganese, Silico Manganese, Ferro Silicon, Pig Iron,… — cleared for impact study, 7 km away
- Binora Sand Quarry — lapsed, 8.9 km away
- Binora Sand Quarry — cleared for impact study, 8.9 km away