Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 21 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Varsha Sood |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Chakjai Rampur |
| Taluk / tehsil | Ujjain |
| District | Ujjain |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04012 |
In context
454 applications in Ujjain since January 2022 are in the same category (Mining): 252 approved, 63 filed or under review, and 139 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
10 other mining leases have applied within 500 m of this site; together with this one they cover 44.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Chakjai Rampur, Ujjain, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Ujjain Airport: A ₹250-Crore Expansion for Simhastha Kumbh in Madhya Pradesh (9.8 km away).
Other projects nearby
- Chakjayrampur Stone Deposit — cleared for impact study, 0 m away
- Chakjayrampur Stone Quarry for Gitti and M-Sand — lapsed, 50 m away
- Chakjayrampur Stone Quarry for Gitti and M-Sand — cleared for impact study, 50 m away
- Chakjairampur Stone Quarry — cleared for impact study, 100 m away
- Chakjairampur Stone Deposit — cleared for impact study, 200 m away
- Chakjairampur Stone Deposit — lapsed, 200 m away
- Surjanwasa Stone Quarry — lapsed, 200 m away
- Surjanwasa Stone Quarry — cleared for impact study, 200 m away
More from Varsha Sood in Ujjain
- Surjanwasa Stone Gitti Quarry (Khasra No.188) — under environmental review
- Chakjayrampur Stone Quarry for Gitti and M-Sand — lapsed
- Surjanwasa Stone Deposit — under environmental review
- Chakjayrampur Stone Quarry for Gitti and M-Sand — cleared for impact study
- Jayawantpur Stone Deposit — lapsed
- Surjanwasa Stone Gitti Quarry — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.