What is Developing? Open the mapMap

Cleared for impact studyIndustry · Ratlam, Madhya Pradesh

Proposed Ferro Alloys Plant having production capacity of Silico Manganese- 48,600 MTPA, Ferro Silicon- 21600 MTPA, Ferro Manganese- 64800 MTPA, Ferro Chrome- 48600 MTPA by installation of 3 x 9 MVA Submerged Arc Furnaces and Ferro Moly/ Ferro Titanium/ LC or MC Ferro Manganese/ LC Ferro Chrome having capacity - 3,600 TPA by Thermite Furnace (5 furnaces for 2 Ton each) at Survey No. 32/1 & 33/1, Gram Shivgadh, Kuajhagar, Tehsil-Sailana, District-Ratlam (M.P.) by SMO Ferro Alloys Pvt. Ltd.

Proposed Ferro Alloys Plant having production capacity of Silico Manganese- 48,600 MTPA, Ferro Silicon- 21600 MTPA, Ferro Manganese- 64800 MTPA, Ferro Chrome- 48600 MTPA by installation of 3 x 9 MVA Submerged Arc Furnaces and Ferro Moly/ Ferro Titanium/ LC or MC Ferro Manganese/ LC Ferro Chrome having capacity - 3,600 TPA by Thermite Furnace (5 furnaces for 2 Ton each) at Survey No. 32/1 & 33/1, Gram Shivgadh, Kuajhagar, Tehsil-Sailana, District-Ratlam (M.P.) by SMO Ferro Alloys Pvt. Ltd is a proposed industrial project in Shivgarh, Sailana, Ratlam, Madhya Pradesh. The site covers 29.9 acres. Its stated project cost is ₹200 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Oct 2024).

See it on the live map All projects in Ratlam

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Ferro Alloys Plant having production capacity of Silico Manganese- 48,600 MTPA, Ferro Silicon- 21600 MTPA, Ferro Manganese- 64800 MTPA, Ferro Chrome- 48600 MTPA by installation of 3 x 9 MVA Submerged Arc Furnaces and Ferro Moly/ Ferro Titanium/ LC or MC Ferro Manganese/ LC Ferro Chrome having capacity - 3,600 TPA by Thermite Furnace (5 furnaces for 2 Ton each) at Survey No. 32/1 & 33/1, Gram Shivgadh, Kuajhagar, Tehsil-Sailana, District-Ratlam (M.P.) by SMO Ferro Alloys Pvt. Ltd is a proposed industrial project in Shivgarh, Sailana, Ratlam, Madhya Pradesh. The site covers 29.9 acres.

Who is building it?

The applicant is Smo Ferro Alloys Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Oct 2024), as of 27 Nov 2026.

Where is it?

In Shivgarh, Sailana, Ratlam, Madhya Pradesh.

How big is it?

It has a stated cost of ₹200 crore and a site of 29.9 acres.

When was it filed?

The application was filed on 19 Sept 2024.

Project details

StatusCleared for impact study
Status since3 Oct 2024
Application filed19 Sept 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSmo Ferro Alloys Private Limited
Land area29.9 acres (12.1 ha)
Project cost₹200 crore
Village / localityShivgarh
Taluk / tehsilSailana
DistrictRatlam
StateMadhya Pradesh
Location fromSite boundary on record
Our referenceWID-MP-04095

In context

6 applications in Ratlam since January 2022 are in the same category (Industry): 3 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Shivgarh, Sailana, Ratlam, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Smo Ferro Alloys Private Limited in Ratlam

All 5 Smo Ferro Alloys projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.