Quick answers
What is Residential Cum Commercial Building "Lila Atulyam"?
Residential Cum Commercial Building "Lila Atulyam" is a lapsed building project in Salaiya, Huzur, Bhopal, Madhya Pradesh. The site covers 10.3 acres.
Who is building it?
The applicant is Lila Developers.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Salaiya, Huzur, Bhopal, Madhya Pradesh.
How big is it?
It has a stated cost of ₹71 crore and a site of 10.3 acres.
When was it filed?
The application was filed on 16 Mar 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Residential Cum Commercial Building "Lila Atulyam"
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 16 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Lila Developers |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹71 crore |
| Village / locality | Salaiya |
| Taluk / tehsil | Huzur |
| District | Bhopal |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04301 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Mar 2024 (this page) | Lapsed | 10.3 acres | ₹71 crore |
| Early planning filed 12 Oct 2023 | Cleared for impact study | 10.3 acres | ₹71 crore |
What the filings say
What is planned
Lila Developers is developing "Lila Atulyam", a residential and commercial complex in Salaiya, Bhopal. The project is being processed under the violation category of the Environmental Impact Assessment (EIA) Notification, 2006, as the applicant admits that approximately 48% of the total built-up area was constructed before obtaining environmental clearance.
The development is planned on a total plot area of 41,500 square metres (4.15 hectares). This includes an existing area of 28,328 square metres and a proposed addition of 13,172 square metres. The total built-up area is 65,797.07 square metres, comprising 31,865.42 square metres of existing construction and 33,931.65 square metres of proposed construction.
The project consists of 10 residential blocks and 4 commercial blocks with a maximum height of approximately 21.3 metres. The residential component includes 622 dwelling units (plus 12 units in Block E1/E2 for a total of 634 flats) and the commercial component includes 176 shops.
| Item | Detail |
|---|---|
| Total Plot Area | 41,500 square metres (4.15 hectares) |
| Total Built-up Area | 65,797.07 square metres |
| Residential Blocks | 10 (D1 to D10) |
| Commercial Blocks | 4 (E1 to E4) |
| Total Dwelling Units | 634 |
| Total Shops | 176 |
| Maximum Floors | G+6 |
| Total Population | 4,096 (Estimated) |
| Total Project Cost | ₹71 crore |
Layout and design
The residential blocks (D1 to D9) are designed as G+6 structures, while Block D10 is designated for Economically Weaker Sections (EWS). The commercial blocks (E1 to E4) also reach G+6 levels, with shops located on the lower floors. The site layout includes internal circulation roads of 6.0 metres, 7.5 metres, and 12.0 metres width.
Parking is provided through a combination of stilt and open spaces. A total of 421 Equivalent Car Spaces (ECS) are planned, with 288 ECS in stilt areas and 133 ECS in open parking. The landscape plan covers 8,335.1 square metres (20.08% of the plot area), featuring flower beds, lawns, and a planned plantation of 518 trees.
Land and surroundings
The project site is located at Khasra No. 160 and 156 (P) in Salaiya village. The land was previously barren and has been converted for residential and commercial use. The site is bounded to the west by the Kaliasot River (0.55 km) and is approximately 10 km from the Van Vihar National Park and Zoo. The Misrod railway station is located about 2 km to the northeast. A 45-metre wide master plan road is proposed near the site boundary.
Water, power and access
The total water requirement during the operational phase is estimated at 532 kilolitres per day (KLD). Fresh water demand of 328 KLD is expected to be met through the Bhopal municipal supply scheme and groundwater. Recycled water will account for approximately 192 KLD to 204 KLD, used for flushing and landscaping.
Sewage generation is estimated at 433 KLD. The applicant proposes an in-house Sewage Treatment Plant (STP) with a capacity of 300 KLD. Excess wastewater will be sent to the common STP at Sankhedi. For storm water management, 12 rainwater harvesting pits are planned with a total volume of 24.74 cubic metres per hour.
Power requirement is estimated at 3,700 KW, to be supplied by the Madhya Pradesh State Electricity Board. A 250 KVA diesel generator set is proposed for power backup, located in the basement with acoustic enclosures.
Environmental safeguards
Solid waste generation is estimated at 1,669 kg/day, including 905 kg/day of biodegradable waste and 664 kg/day of non-biodegradable waste. Biodegradable waste will be treated using an organic waste converter on-site.
During the construction phase, mitigation measures include water sprinkling for dust control, green net covers, and anti-smog guns. The Environmental Management Plan (EMP) allocates a capital cost of ₹40 lakh for the construction phase and ₹230 lakh for the operational phase. Because this is a violation case, the applicant's project report notes that a damage assessment and augmentation plan will be prepared as part of the EIA study.
Residential Cum Commercial Building Lila Atulyam site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
44 applications in Bhopal since January 2022 are in the same category (Buildings & townships): 30 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 10.3 acres, this one is larger than 57% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Salaiya, Huzur, Bhopal, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Cum Commercial Building "Lila Atulyam" — cleared for impact study, 0 m away
- Proposed "Mukund Majesty" Development of Multi-Unit Residential (Apartment)… — environmental approval granted, 150 m away
- "Canal Kinship Paramount" of Group Housing (Residential Flat) — environmental approval granted, 200 m away
- Proposed Housing project "Sidhi Sanskriti" — environmental approval granted, 550 m away
- Proposed construction of The CITADEL by Amaltas — cleared for impact study, 650 m away
- Project of Residential Towers " SAGAR SUNRISE " — environmental approval granted, 700 m away
- To Obtain Environment Clearance for Residential Project (" Sagar Sunrise-II) — environmental approval granted, 950 m away
- Obtaining Environmental Clearance for proposed Educational Project of " Sagar… — environmental approval granted, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.