Quick answers
What is Pasan Sand Mine?
Pasan Sand Mine is a proposed mining project in Pasari, Anuppur, Madhya Pradesh. The site covers 15 acres.
Who is building it?
The applicant is Pramod Saxena.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Apr 2024), as of 27 Nov 2026.
Where is it?
In Pasari, Anuppur, Madhya Pradesh.
How big is it?
It has a stated cost of ₹96 lakh and a site of 15 acres.
When was it filed?
The application was filed on 2 Feb 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Apr 2024 |
| Application filed | 2 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Pramod Saxena |
| Land area | 15 acres (6.1 ha) |
| Project cost | ₹96 lakh |
| Village / locality | Pasari |
| Taluk / tehsil | Anuppur |
| District | Anuppur |
| State | Madhya Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-MP-04375 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Mar 2025 | Lapsed | 15 acres | ₹96 lakh |
| Early planning filed 2 Feb 2024 (this page) | Cleared for impact study | 15 acres | ₹96 lakh |
In context
134 applications in Anuppur since January 2022 are in the same category (Mining): 45 approved, 29 filed or under review, and 60 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 15 acres, this one is larger than 79% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Pasari, Anuppur, Madhya Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Pasan Sand Mine — lapsed, 0 m away
- Pasan Water Supply Scheme — forest land use approved, 1.2 km away
- Water Supply Scheme Pasan — forest land use approved, 1.5 km away
- Lahsui Pmgsy Road to Dadaibahra Baiga Basti — lapsed, 3.8 km away
- Lahsui Pmgsy Road to Dadaibahra Baiga Basti — lapsed, 3.8 km away
- Lahsui Pmgsy Road to Dadaibahra Baiga Basti — lapsed, 3.8 km away
- Road From Bharra Tola Chondi to Baigan Mohalla — more information requested, 4.2 km away
- Bifurcation of 33 KV Feeder from 132 KV EHV S/S to 33/11 KV S/S Funga — lapsed, 5.6 km away
More from Pramod Saxena in Anuppur
- Cholna Sand Mine — lapsed
- Khujarwar Sand Quarry — lapsed
- Manpur Sand Mine — not approved
- Balbehra Sand Quarry — environmental approval granted
- Balbehra Umariya Sand Quarry — environmental approval granted
- Jaithari Gobri Sand Mine — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.